|
Electrical
& Software Control Systems for Safe Rides & Shows |
(407) 290-2000 |
|
|
Brian C. Kuhar Controls engineer Brian was key to the successes of the Disney-MGM Studios' Lights! Motors! Action! Extreme Stunt Showä and Universal Studios Hollywood's® Fear Factor Live attractions, both opening in 2005. Previously, Brian was responsible for
Birket Engineering's show control integration, installation, and test
of Universal Studios
Japan’sä Wild Wild Wild West Stunt ShowSM,
Universal Monsters Live Rock and Roll Showä, Hollywood Magicä, Working as project engineer, Brian pulled together several design/assemble/install projects for the Walt Disney Company. Before coming to Birket Engineering, Brian worked with Walt Disney Imagineering to develop a company-wide post-turnover support program and on the installation support of EPCOT's® Illuminations 2000: Reflections of Earth. |
| www.birket.com | P.O. Box 610190, Ocoee, FL 34761-0190 | fax (407) 654-2150 |